Saturday, December 20, 2008

Saturday, November 29, 2008

Mostly moved...

Few updates as we've been moving. Thanksgiving day was the big stuff move date. We also did dinner with Chris, Val and Conner. Sleeping in the new house now, although there's still a lot of little stuff in the other house to transfer over or otherwise deal with.

Tuesday, November 25, 2008

Success!

Monday, November 24, 2008

Moved our guest/tv room


New Appliances!

We got our kitchen appliances.

The Fridge looks great.

The Dishwasher needed a special order part, that should be in tomorrow.

This is the range. It is 1/4" too wide.

This is our solution...

Thursday, November 20, 2008

Paint and Trim!



Adam painted Molly's room today. 2 walls are still white, 2 are now bright yellow.
He also bought trim for around the baseboards.

Tuesday, November 18, 2008

Windows!


The windows are all in. Tomorrow they come fix the stucco on the outside of the house. Yippee!!!

Monday, November 17, 2008

Windows and Doors!


Our window guys are finally here. Apparently, they've installed our new sliding glass doors now. They can open from the middle... to a 6-foot span of open-ness!

Saturday, November 15, 2008

During Party


Pre-Party




Friday, November 14, 2008

Drywall work and stuff




We've been busy this week. The drywall guy FINALLY came this afternoon and finished the drywall, so now we're almost ready for painting. Adam got a plumber to finish up with the kitchen sink and the gas line for the range. He also got a big diningroom fixture up. Now, it's all a hurried clean-up before the party tomorrow. After the party, we'll have loads of other details: Painting, baseboards, windows, sliding glass door, kitchen appliances, new switchplates and other joys.

Tuesday, November 11, 2008

Yes, we're still working...

The tile is done, and Adam has installed a transition. This is all messy because he's grouted the gap (it will be all pretty soon).

He's also in process of installing our new dining room light.


Molly was home sick today, so that cut into the progress... we've finally heard from the Window installers... they come on Monday. Still waiting on drywall finisher, etc.

Adam did paint my office, though, so we'll be able to start moving garage and office stuff sometime soon. (Maybe after Monday...)

We're having a little open-house house-warming for the neighborhood and close by friends on Saturday. One challenge of that will be getting the house cleaned up in time! Still, things are moving, which is good. Looks like moving will occur around Thanksgiving...

Saturday, November 8, 2008

Thursday, November 6, 2008

Monday, November 3, 2008

Tile put into the kitchen




Probably one more day of putting in tile, then grout!

Sunday, November 2, 2008

Saturday, November 1, 2008

Finished putting in tiles in the diningroom


On to the transition and the kitchen. Later: grout.

Thursday, October 30, 2008

Tuesday, October 28, 2008

Faucet


Adam got a lot of work done today... finishing screwing down the backerboard, hiding the wire to the diningroom light fixture, and putting in the new faucet and airgap. Pretty, huh?

Monday, October 27, 2008

Granite goes in

Sunday, October 26, 2008

Saturday, October 25, 2008

Saturday with the new house


Someone asked me what the new house looked like, and I realized we didn't have a picture. So here it is.
We have a pretty red rose in the front yard (well, a little ragged there on the bottom).

Finally, among other things, Adam screwed down an enormous number of screws into the Hardibacker board. Tile will happen after the granite, which is due to be installed on Monday!

Thursday, October 23, 2008

Thursday work





Today, Adam worked more on drywall, priming the ceiling and leveling the floors.